| About this data sheet: |
| Structure-ID: |
s0001110 |
| Created on: |
10/19/00 |
| Modified on: |
02/02/05 |
|
 |
 |
|
 |  |  |
|
|
|
|
Structural Type:
|
|
|
Function / usage:
|
|

|

|
| Part of structure | Description | Value |
| deck |
composite steel-reinforced concrete
|
| piers |
reinforced concrete
|
|
| |
total length |
2 880.400 m |
| deck |
deck depth |
2.82 m | | |
deck width |
27.2 m |
| main bridge |
main span |
560 m | | |
span lengths |
286 m - 3 x 560 m - 286 m | | |
length of main bridge |
2 252 m |
|

| 1880
|
| Harilaos Trikoupis, then prime minister of Greece, is among the first to imagine a link at this location. |
| 21 May 2004
|
| The last piece of the deck is mounted. |
| Night of 7 August 2004 - 8 August 2004
|
| In a grand ceremony including major fireworks, the bridge is officially inaugurated. |
| 8 August 2004
|
| Irina Szewinska from Poland and winner at the olympic games in Montreal and Mexico, Otto Rehagel, coach of the Greek soccer team that won the Euro 2004 championship, and Stratos Apostolakis, coach of the Greek Olympic soccer team, carry the Olympic flame across the bridge on its way to Athens for the Summer Olympics. |
| 12 August 2004
|
| The bridge is opened to traffic. |
| 28 January 2005
|
| One of the cables catches fire, possibly after being hit by lightning. The bridge is closed to traffic indefinitely in order to assess the damage. |
| 1 February 2005
|
| The bridge is re-opened to traffic, though use is limited to a single lane until the damage to the cable-stay has been repaired. |
|

The concessionaire Gefyra is composed of:
- Vinci (53%)
- J&P Hellas (11,2%)
- TEV (7,74%)
- Helleniki Technodomiki (7,74%)
- Athena (7,74%)
- Proodeftiki (7,74%)
- Sarandopoulos (7,74%)
|
Financing:
- Greek Government: 43%
- European Investment Bank: 47%
- Stock holder capital: 10%
Expected traffic: 11 000 vehicles/day |
Duration of construction: 5 years
Length of the concession: 42 years |
| The bridge is designed to withstand earthquakes of 7.5 on the Richter scale. |
Toll rates:
- Pedestrians and bicycles: free
- motorbicycles 1.50 €
- cars 9.70 €
- trucks 15.00 - 44,00 € (depending to the type of truck)
- buses 23.50 € (-20 seats)
- buses 33.50 € (20-40 seats)
- buses 51.00 € (40+ seats)
(as Structurae is not affiliated with the concessionaire, this information is without guarantee) |
|

|

 |
Les acteurs du projet, in
"Travaux", June 2004, n. 809 .
|
 |
Cranes take the strain on Greek project, in
"Bridge Design & Engineering", 2nd Quarter 2001, n. 23 v. 7 .
|
 |
Firm foundations, in
"Bridge Design & Engineering", 2nd Quarter 1999, n. 15 v. 5 .
|
 |
Freyssinet cable-stayed structures, Freyssinet International, Vélizy-Villacoublay (France) , 2004; pp. 70-71.
|
 |
Olympian effort, in
"Bridge Design & Engineering", 1st Quarter 2004, n. 34 v. 10 .
|
 |
Opening with a bang, in
"Bridge Design & Engineering", 3rd Quarter 2004, n. 36 v. 10 .
|
 |
Le pont de Rion-Antirion, in
"Bulletin annuel de l'AFGC", 2004, n. 6 .
|
 |
Rion rising, in
"Bridge Design & Engineering", 1st Quarter 2003, n. 30 v. 9 .
|
 |
Vinci - Un pont chez Poséidon, Editions Textuel, Paris (France) , ISBN 2952076928, 2004.
|
 |
Beideler, Julien Le pont de Rion-Antirion. Un défi à Poséidon, in
"Le Moniteur des Travaux Publics et du Bâtiment", 17 October 2003, n. 5212 .
|
 |
Beideler, Julien Pont de Rion-Antirion: suspension de haute volée pour le tablier, in
"Le Moniteur des Travaux Publics et du Bâtiment", 5 March 2004, n. 5232 .
|
 |
Beideler, Julien Rion-Antirion: pari gagné, in
"Le Moniteur des Travaux Publics et du Bâtiment", 27 August 2004, n. 5257 .
|
 |
Beideler, Julien Le tablier de Rion-Antirion est achevé, in
"Le Moniteur des Travaux Publics et du Bâtiment", 28 May 2004, n. 5244 .
|
 |
Boutillon, Laurent Les haubans et la stabilisation provisoire des fléaux. Une histoire parasismique, in
"Travaux", June 2004, n. 809 .
|
 |
Buitelaar, Marlen Construction of the Rion-Antirion Bridge Foundations, Greece, in
"Bridge and Foundation Engineering", August 2004 .
|
 |
Chevalme, Marie-Noël Les équipements du viaduc Sud de la liaison Rion-Antirion, in
"Ouvrages d'art", November 2004, n. 47 .
|
 |
Combault, J. Rion-Antirion Bridge, Greece - Concept, Design and Construction, in
"Structural Engineering International", 2005, n. 1 v. 15 .
|
 |
Combault, Jacques The exceptional structure of the Rion Bridge in Greece, presented at Long-Span and High-Rise Structures, IABSE Symposium, Kobe, 1998.
|
 |
Deslandes, Jean-Louis Construction des embases des piles, in
"Travaux", June 2004, n. 809 .
|
 |
Donnaes, Philippe Rion-Antirion: le nouveau titan grec, in
"Chantiers de France", October 2003, n. 364 .
|
 |
Fobo, Wolfgang Good reserves, in
"Bridge Design & Engineering", 4th Quarter 2003, n. 33 v. 9 .
|
 |
Gernigon, Patrick Etudes aérodynamiques, in
"Travaux", June 2004, n. 809 .
|
 |
Hervé, Jérôme Pont Rion-Antirion, in
"Le Moniteur des Travaux Publics et du Bâtiment", 24 May 2002, n. 5139 .
|
 |
Infanti, Samuele Protective measures, in
"Bridge Design & Engineering", 2nd Quarter 2004, n. 35 v. 10 .
|
 |
Infanti, Samuele Rion-Antirion Bridge, presented at fib Symposium 2003 "Concrete structures in seismic regions", Athens, Greece, 6-9/05/2003.
|
 |
Jacquot-Preaux, Claude Les pylônes du pont principal. Travailler en sécurité à 165 m au-dessus du niveau de la mer, in
"Travaux", June 2004, n. 809 .
|
 |
Kakuta, Takahiro The latest cases of innovative projects in Europe, in
"Journal of Prestressed Concrete, Japan", January - February 2004, n. 1 v. 46 .
|
 |
Lefebvre, Renaud Spanning Poseidon's Realm, France , ISBN 2952076936.
|
 |
Lemaire, Fabrice Le tablier du pont principal, in
"Travaux", June 2004, n. 809 .
|
 |
Marchetti, M. Adjustment of the Rion-Antirion Cable-Stayed Bridge, presented at 1st FIG International Symposium on Engineering Surveys for
Construction Works and Structural Engineering, The University of Nottingham, United Kingdom, 28 June - 1 July 2004.
|
 |
Mikaelian, Berdj Le parti architectural, in
"Travaux", June 2004, n. 809 .
|
 |
Morand, Pierre La construction des piles du pont de Rion-Antirion en Grèce, in
"Travaux", January 2002, n. 782 .
|
 |
Morand, Pierre Les travaux maritimes, in
"Travaux", June 2004, n. 809 .
|
 |
Narboni, Roger La mise en lumière du pont. Une mise en scène nocturne mystérieuse et onirique, in
"Travaux", June 2004, n. 809 .
|
 |
Pecker, Alain Les fondations. Problèmes géotechniques, in
"Travaux", June 2004, n. 809 .
|
 |
Reina, Peter M. Bridge Builders Tackle Olympian Challenges, in
"Engineering News Record", 8 January 2001 .
|
 |
Russell, Helena Greek triumph, in
"Bridge Design & Engineering", 4th Quarter 2000, n. 21 v. 6 .
|
 |
Scheuch, Gerhard Projekt der Peleponnes-Brücke Rion-Antirion, in
"Bautechnik", January 2000, n. 1 v. 77 .
|
 |
Souflias, Giogos Préface, in
"Travaux", June 2004, n. 809 .
|
 |
Teyssandier, Jean-Paul Avant-propos, in
"Travaux", June 2004, n. 809 .
|
 |
Teyssandier, Jean-Paul Corinthian Crossing, in
"Civil Engineering Magazine", October 2002, n. 10 v. 72 .
|
 |
Teyssandier, Jean-Paul Genèse du projet, in
"Travaux", June 2004, n. 809 .
|
 |
Teyssandier, Jean-Paul Le pont de Rion-Antirion. Un ouvrage exceptionnel à vocation européenne, in
"Travaux", December 1998, n. 748 .
|
 |
Torres Arcila, Martha Bridges - Ponts - Brücken, Atrium, Mexico City (Mexico) , ISBN 8495692619, 2002; pp. 514-519.
|
 |
Tourtois, Jean-Marc Conception du pont de Rion-Antirion, presented at VIIème Colloque National AFPS, Ecole Polytechnique, France, 1-3.7.2003.
|
 |
Tourtois, Jean-Marc Conception et études d'exécution, in
"Travaux", June 2004, n. 809 .
|
 |
Tourtois, Jean-Marc Etude de la vibration des haubans, in
"Travaux", June 2004, n. 809 .
|
 |
Tourtois, Jean-Marc Pont de Rion-Antirion, presented at Montreal Structural Engineers Lectures, Canadian Society for Civil Engineering, Montreal, 2.5.2001.
|
 |
Vavel, Antoine La force et la grâce unies contre les éléments, in
"Construction moderne", 2004 .
|
|
|
 |